New subway line drilled through in Beijing
Share - WeChat

BEIJING -- The entire tunnel of Beijing Subway Line 17 was drilled through after the middle section of the tunnel was bored through on Monday, its builder China Railway 14th Bureau Group Corporation Limited announced.
Beijing Subway Line 17 is a major transportation artery that runs north to south in the Chinese capital, where about 21.9 million people live.
With a total length of 49.7 kilometers, Line 17 is designed to have 21 stations. The northern and southern sections of the line opened to traffic in 2023 and in 2021.
Once the entire line is operational in the future, it is expected to alleviate traffic pressure on Line 5 and Line 10.
- China, Thailand to enhance cooperation in intelligent rehabilitation
- Sichuan reports first case of HIV-2 infection
- Global experts gather in Shanghai to address urban resilience
- Hainan suspends transport as Typhoon Fengshen approaches
- Liuyang fireworks set Guinness World Records
- Blue alert issued for Fengshen, 24th typhoon of the year