免费av毛片,日韩av高清在线播放,97国产精品最好的产品,欧美成人免费一区二区三区,神马午夜一区,曰河南少妇对白视频,欧美自拍视频

chinadaily.com.cn
left corner left corner
China Daily Website

Major step for gas field in South China Sea

Updated: 2013-05-24 14:23
By WANG QIAN ( chinadaily.com.cn)

A major section of the Liwan 3-1 offshore gas field project in the South China Sea was completed, the Xinhua News Agency reported on Thursday.

The topside portion of the central platform, the largest in Asia, was put in place. The connecting pipes, made, designed and installed by the state-owned China National Offshore Oil Corp (CNOOC), were also put in place.

The Liwan 3-1 gas field, lying in an average water depth of 1,300 meters, is expected to start operations later this year, with an estimated gas output of 12 billion cubic meters of natural gas every year, mainly supplying southern parts of China.

8.03K
 
...
...
...