免费av毛片,日韩av高清在线播放,97国产精品最好的产品,欧美成人免费一区二区三区,神马午夜一区,曰河南少妇对白视频,欧美自拍视频

 
 

Home/News

CEEC: No.2 unit of Warora Project runs up successfully

Updated: 2013-08-05

On Aug 5 (local time), the No.2 unit of Warora 2*300MW project, which was undertaken by CEEC, was successfully set to a constant speed of 3,000 RPM, with satisfactory main technical indicators such as turbine vibration and bushing temperature, etc.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.