免费av毛片,日韩av高清在线播放,97国产精品最好的产品,欧美成人免费一区二区三区,神马午夜一区,曰河南少妇对白视频,欧美自拍视频

 
 

Home/News

CEEC begins to repair Dunai Dam in Angola

Updated: 2013-09-05

Aug 28 saw the commencement of CEEC-contracted repair of the Dunai River Dam in Benguela province, Angola.

The project is on the Dunai River in the suburb of Cubal city, Benguela province. Scheduled to be completed within 6 months, its main construction work includes dam reconstruction, repair of water-intake structures, river course clean-up, etc.

After the project is completed, the dam’s water diversion tunnel will be approximately 5 kilometers in length and will be connected to the diversion channel, through which river water will flow directly to Benguela to provide production water and domestic water for the urban area.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.