免费av毛片,日韩av高清在线播放,97国产精品最好的产品,欧美成人免费一区二区三区,神马午夜一区,曰河南少妇对白视频,欧美自拍视频

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment and Metal Structure Installation at Jufudu Hydropower Station (China)

Updated: 2014-04-01

The Jufudu Hydropower Station is equipped with three 95MW units to reach a total installed capacity of 285MW. CGGC built the catch-water channel and powerhouse, and installed the electromechanical equipment and mental structures of the station.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.