免费av毛片,日韩av高清在线播放,97国产精品最好的产品,欧美成人免费一区二区三区,神马午夜一区,曰河南少妇对白视频,欧美自拍视频

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station (China)

Updated: 2014-04-01

As a national key hydropower construction project in China's "11th five-year plan" period, the Bailianhe Pumped Storage Power Station is the first large-scale pumped storage power station owned by the Central China Power Grid. CGGC installed all the electromechanical equipment of this project.

Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station (China)

Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.