免费av毛片,日韩av高清在线播放,97国产精品最好的产品,欧美成人免费一区二区三区,神马午夜一区,曰河南少妇对白视频,欧美自拍视频

 
 

Home/Our Business/Equipment Installation

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

Updated: 2014-04-01

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project

 

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.